---
product_id: 274705346
title: "Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard (10m, Black)"
brand: "delfino"
price: "NT$691"
currency: TWD
in_stock: true
url: https://www.desertcart.tw/products/274705346-extra-long-line-training-dog-leash-long-lead-for-large
store_origin: TW
region: Taiwan
---

# 10m ultra-long reach 360° swivel metal hook durable nylon & metal build Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard (10m, Black)

**Brand:** delfino
**Price:** NT$691
**Availability:** ✅ In Stock

## Summary

> 🐾 Master the art of recall with the leash that keeps up with your dog's wild side!

## Quick Answers

- **What is this?** Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard (10m, Black) by delfino
- **How much does it cost?** NT$691 with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.tw](https://www.desertcart.tw/products/274705346-extra-long-line-training-dog-leash-long-lead-for-large)

## Best For

- delfino enthusiasts

## Why This Product

- Trusted delfino brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Key Features

- • **360° Freedom:** Swivel hook prevents tangles, letting your dog explore safely without leash twists.
- • **Built to Last:** Premium nylon leash paired with a rust-resistant metal hook ensures durability beyond cotton alternatives.
- • **Adventure Ready:** Ideal for hiking, camping, beach days, or backyard play—turn every outing into a training opportunity.
- • **Train Like a Pro:** 10-meter length gives your dog freedom while maintaining control for flawless recall training.
- • **Versatile for All Breeds:** Perfectly sized for everything from Chihuahuas to German Shepherds—one leash fits all your furry friends.

## Overview

The DELFINO Extra Long Line Training Dog Leash offers a 10-meter durable nylon lead with a 360° swivel metal hook, designed for effective recall training and versatile outdoor use. Lightweight yet robust, it suits all dog sizes and withstands rigorous activities like hiking, camping, and play.

## Description

DELFINO Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard (10m, Black)

## Features

- Dog Training Lead 10 meter, black.
- Made of strong nylon and durable metal hook, will outlast cotton leashes, easy to wear and remove.
- The 10 meters long lead is used for helping to train the re-call of your dog. It will be more convenient for you to training your lovable dog.
- Trigger hook for easy attachment to your dog's own collar, rotated by 360 degree allows your pet to play more secure. Allows you to teach your dog recalls and other obedience skills.
- Suitable for many pets like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming.

## Technical Specifications

| Specification | Value |
|---------------|-------|
| Product Dimensions | 10 x 10 x 10 cm; 250 g |
| Closure | Snap |
| Color | black |
| Size | One Size |
| Quantity | 1 |
| batteries required | No |
| Batteries Included | No |
| Item Weight | 250 g |

## Product Details

- **Size:** One Size
- **Colour:** black
- **Brand:** DELFINO
- **Material:** Nylon
- **Product dimensions:** 10L x 0.03W Meters

## Images

![Extra Long Line Training Dog Leash, Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard (10m, Black) - Image 1](https://m.media-amazon.com/images/I/61Bug-1H+hL.jpg)

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.tw/products/274705346-extra-long-line-training-dog-leash-long-lead-for-large](https://www.desertcart.tw/products/274705346-extra-long-line-training-dog-leash-long-lead-for-large)

---

*Product available on Desertcart Taiwan*
*Store origin: TW*
*Last updated: 2026-08-15*