Description
- Works with Mitel IP 5000 Series Phones (ie. 5312 5320 5320e 5324 5330 5330e 5340 5340e 5360)
- 2 FT Coiled | 12 FT Uncoiled
- one end with 3 inch and and another with 2 inch flat leader.
Mitel12 Ft Flat Black Long Lead Handset Cord For IP 5000 Series Phones